LMS PS27 w/jump track
Antenna_being_lowered_1_smAntenna_being_lowered_2_smIMG_1870IMG_1871IMG_1874IMG_1875DCF 1DCF 1DCF 1

LMS PS27 GIN POLE

Product Description

Landa Mobile Systems LLC new gin-pole construction is 100% in compliance with TIA-1019-A 2011 standard, meeting or exceeding TIA-1019-A, 6.1. scope, 6.2. manufacturing, 6.2.1, structural steel 6.2.2, other materials 6.2.3 test reports,  6.2.4 fabrication, 6.2.5 straightness, 6.2.6 (a.b.) identification.  AWA Certified. U.S. AWS Certified Welder Assembled, and AWS Independent Contractor Inspected.

OSHA required Forms supplied with all LMS gin poles we manufacture.
Annual Pole Certification signed and numbered
Annual Pole Inspection Report signed and numbered
VT Visual Welding Inspection Report, done at time of manufacture
Mill Report on steel specification, A500 Gr. B
Charpy report on steel temperature test to –40 degrees
Load Chart that the pole was manufactured to. 2 pages.
Maintain your required documents along with work plan and engineer sign-off for each specific job.